Article | Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden | Development accompanying calculation - How to calculate IPS² costs during the early development phase?
Göm menyn

Title:
Development accompanying calculation - How to calculate IPS² costs during the early development phase?
Author:
M. Steven: Faculty of Management and Economics, Ruhr-University Bochum, Germany T. Soth: Faculty of Management and Economics, Ruhr-University Bochum, Germany
Download:
Full text (pdf)
Year:
2010
Conference:
Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden
Issue:
077
Article no.:
023
Pages:
181-187
No. of pages:
7
Publication type:
Abstract and Fulltext
Published:
2012-10-11
ISBN:
978-91-7393-381-0
Series:
Linköping Electronic Conference Proceedings
ISSN (print):
1650-3686
ISSN (online):
1650-3740
Publisher:
Linköping University Electronic Press; Linköpings universitet


Export in BibTex, RIS or text

Recently; many companies of the capital goods industry are moving away from simply offering individual products to providing innovative customized solutions; so called Industrial Product-Service Systems (IPS²). This article introduces a system which enables the calculation of an IPS² in the early phase of development. This system is based on specific IPS² characteristics and information which is provided in the different phases of development. We therefore deduce the requirements for the development accompanying calculation which are caused by the transformation from a product supplier to a supplier of IPS². Subsequently; we make use of a systematic illustration of these requirements to examine to what extent traditional instruments of construction accompanying calculation are able to meet these requirements and to reveal weaknesses of these instruments. We then provide solution alternatives; which lead to the design of a calculation system for IPS².

Keywords: IPS²; Development accompanying calculation; Time-Driven Activity-Based Costing; Target Costing

Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden

Author:
M. Steven, T. Soth
Title:
Development accompanying calculation - How to calculate IPS² costs during the early development phase?
References:

[1] Meier; H.; Uhlmann; E.; Kortmann; D.; 2005; Hybride Leistungsb√ľndel. Nutzenorientiertes Produktverst√§ndnis durch interferierende Sach- und Dienst-leistungen; wt online; 95: 528-532.


[2] Spath; D.; Demu√ü; L.; 2006; Entwicklung hybrider Produkte ‚Äď Gestaltung materieller und immaterieller Leistungsb√ľndel; in: Bullinger; H-J.; Scheer; A-W.; (ed.): Service Engineering- Entwicklung und Gestaltung innovativer Dienstleistungen; Springer; Berlin; 2nd Ed: 463-502.


[3] Horv√°th; P.; Gleich; R.; Scholl; K.; 1996; Vergleichende Betrachtung der bekanntesten Kalkulationsmethoden f√ľr das kosteng√ľnstige Konstruieren; KRP Sonderheft; 1/1996: 53-62.


[4] Burger; A.; 1999; Kostenmanagement; Oldenburg; M√ľnchen 3rd Ed.


[5] Stirzel; M.; Zeibig; S.; 2009; Target Costing; Controlling 6/2009: 322-325.


[6] Horv√°th; P.; 2009; Controlling; Vahlen; M√ľnchen 11th Ed.


[7] Seidenschwarz; W.; 2009; Target Costing - Marktorientiertes Zielkostenmanagement; Vahlen; M√ľnchen 2nd Ed.


[8] Meier; H.; Kortmann; D.; Krug; C.; 2006; Von der Technologie zur Nutzenf√ľhrerschaft ‚Äď Die Zukunft der Werkszeugmaschine als hybrides Leistungsb√ľndel; ZWF; 7-8/2006: 431-434.


[9] Ehlenspiel; K.; Kiewert; A.; Lindemann; U.; 2000; Kosteng√ľnstig entwickeln und konstruieren; Springer; Berlin 3rd Ed.


[10] Denkena; B.; Rudzio; H.; Eik√∂tter; M.; Bl√ľmel; P.; 2009; Total Cost and Benefit of Ownership; Industrie Management; 5/2009: 35-38.


[11] Lorenzen; L.-E.; Rudzio; H.; Bl√ľmel; P.; 2009; Die totale Kostenkontrolle: Ergebnisse einer Umfrage zu dem Thema Total Cost of Ownership; wt online; 96: 489-494.


[12] Wynstra; F.; Hurkens; K.; 2005; Total Cost and Total Value of Ownership; in: Essig; M. (ed.): Perspektiven des Supply Management: Konzepte und Anwendungen; Springer; Berlin; Heidelberg; New York: 463-482.


[13] Tönshoff; H.K.; Reinsch; S.; Eger; M.; 2005; Lebenszykluskosten von Werkzeugen und Formen; wt online; 96: 872-876.


[14] Coenenberg; A. G.; Fischer; T.; Schmitz; J.; 1994; Target Costing und Product Life Cycle Costing als Instrumente des Kostenmanagements; ZP; 1994: 1- 38.


[15] Buggert; Wielp√ľtz; 1995; Target Costing ‚Äď Grundlagen und Umsetzung des Zielkostenmanagements; Hanser; M√ľnchen; Wien.


[16] Schwengels; C.; 2004; Ein Verfahren zur kostenorientierten Entwicklung von Dienstleistungen im Rahmen hybrider Produkte; Jost-Jetter; Heimsheim.


[17] Steven; M.; Wasmuth; K.; Soth; T.; 2008; Cost Management for PPS; in: Transregio 29 (ed.) ; Transregio 29. Product-Service Systems. Dynamic Interdependency of Products and Service in the Production Area - International Seminar on PPS 21- 22 January 2008; Shaker; Aachen: 53-58.


[18] Reckenfelderb√§umer; M.; 2004; Die Wirtschaftlichkeitsanalyse von dienstleistungsorientierten Gesch√§ftsmodellen als Herausforderung f√ľr das Controlling; in: Meier; H. (ed.); Dienstleistungsorientierte Gesch√§ftsmodelle im Maschinen- und Anlagenbau ‚Äď Vom Basisangebot bis zum Betreibermodell; Springer; Berlin; Heidelberg: 209-242.


[19] Labro; E.; 2004; The Cost Effects of Component Commonality: A Literature Review Through a Management-Accounting Lens; Manufacturing & Service Operations Management; 6: 358-367.


[20} Engelhardt; W. H.; Kleinaltenkamp; M.; Reckenfelderb√§umer; M.; 1993; Leistungsb√ľndel als Absatzobjekt ‚Äď Ein Ansatz zur √úberwindung der Dichotomie von Sach- und Dienstleistungen; ZfBf; 45/5: 395-426.


[21] Cooper; R.; Kaplan; R.S.; 1991; Activity-Based Costing: Ressourcenmanagement at its best; Harvard Manager; 13/4: 87-94.


[22] Kaplan; R.S.; Cooper; R. 1998; Cost & Effect ‚Äď Using Integrated Cost Systems to Drive Profitability and Performance.


[23] Kaplan; R.S.; Anderson; S.R. 2004; Time-Driven Activity-Based Costing; HBR 85/11:131-138.

Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden

Author:
M. Steven, T. Soth
Title:
Development accompanying calculation - How to calculate IPS² costs during the early development phase?
Note: the following are taken directly from CrossRef
Citations:
No citations available at the moment


Responsible for this page: Peter Berkesand
Last updated: 2017-02-21